Changes to NFPA 70E 2024 edition
![](https://i.ytimg.com/vi/IrdSkGvhBs8/mqdefault.jpg)
44:58
Introduction to NFPA 70E (2021), Part 1: The Electrically Safe Work Condition
![](https://i.ytimg.com/vi/KiRvx5GAFAI/mqdefault.jpg)
58:34
Motors: Conductor sizing and overcurrent protection
![](https://i.ytimg.com/vi/hqBpf9kXAFo/mqdefault.jpg)
1:13
How much voltage on this high-leg 3-phase system
![](https://i.ytimg.com/vi/Raqepp9A7WY/mqdefault.jpg)
1:07:28
2024 NFPA 70E Major Changes - Jim Phillips, P.E.
![](https://i.ytimg.com/vi/uJYWTzkyzks/mqdefault.jpg)
40:36
When are grounding/bonding bushings required in the NEC?
![](https://i.ytimg.com/vi/0_RzU2HXSlk/mqdefault.jpg)
16:24
Identifying a Bad Secondary Neutral as the Problem.
![](https://i.ytimg.com/vi/WrcVfk5m5CM/mqdefault.jpg)
1:03:19
Introduction to NFPA 70E (2021), Part 2: Arc flash risk assessment and PPE tables.
![](https://i.ytimg.com/vi/TKFRsuBGYmM/mqdefault.jpg)
21:04