PSC I-girder Prestressing Concrete | Methodology Of Stressing of PSC Girders | Post Tensioning Work
19:36
Pre Tensioning vs Post Tensioning | Prestressed Concrete | Pre Tensioning | Stressing Work |
13:46
Processo de fabricação de vigas de pontes com vergalhões. Fábrica de concreto pré-moldado na Coréia.
7:30
Girder Launching,#Bridge Construction girder Launching, Flyover Construction.
27:53
Amazing factories and processes | Manufacturing method and top 5 processes | Mass production process
28:05
Electrical Project HT VCB to LT ACB Panel and LT Panel RTCC Transformer connection 11000 to 440,240V
17:30
Construindo a Maravilha: Segredos da Represa Hoover revelados
31:01
4 Concrete Test Live Practical | Slump Test | Cube test | Temperature Test | Rebound hammer Test
28:42