Engine Installation - Sling TSI Build. Experimental Kit Aircraft
13:32
Firewall Forward. Sling TSI Build Update
15:45
Windscreen Installation Part 2 - Sling TSI Build Update
18:17
Sling TSI Build Update - Fuel System Use of Fuel Manifold Assembly, Upgraded Fuel hose, Fire Sleeve
15:12
Verner Kitfox 5 Ep42, Wing tips, baggage floor and tail surfaces
10:09
gearbox adapter upgrade/final instal on 165hp rotax powered Avid Flyer.(worlds most powerful Avid?)
19:12
1000 Build Hours - Build Update and Review of Upgrades
19:36
November 2024 Update for the Sling TSi Home Built Aircraft
16:07