CKS2500 - INTRODUCTION OF SWITCHES AND LEVERS IN OPERATOR CABIN
26:14
Packing Onions and Potatoes
17:02
CKE2500G‐2/CKS2500 ‐ Assembly #3/7 (INITIAL ASSEMBLY OF THE MACHINE)
32:52
CKE2500G‐2/CKS2500 ‐ Assembly #7/7 (ASSEMBLY OF LUFFING ATTACHMENT)
19:36
CKE2500G‐2/CKS2500 ‐ Assembly #4/7 (ASSEMBLY OF CRANE ATTACHMENT (STANDARD BOOM TIP))
24:01
CKE2500G‐2/CKS2500 ‐ Assembly #1/7 (ASSEMBLY OF BASE MACHINE)
24:35
CKE2500G‐2/CKS2500 ‐ Assembly #6/7 (ASSEMBLY OF CRANE ATTACHMENT (FIXED JIB))
13:27
CKE2500G‐2/CKS2500 ‐ Assembly #2/7 (INSTALLATION OF WEIGHT)
20:51