Bare-Hand, Hot-Line/Hand work directly on 220kV Live Power Line. Watch at 1.5x for better experience
5:43
Line Trap & Coupling Capacitor Function. Wave Trap, CC function. Line Trap components & Structure.
27:28
33kV Live Tension Insulator Replacement
17:31
Transmission Lines | Conductor Sagging | Stringing
10:44
Hotline maintenance work 400 kv.
16:08
Understanding an Equipotential Protective Grounding Zone
15:48
Cable Termination In Panel | Terminate Medium Voltage Cable | Underground Cable Termination
3:28
Twin line stringing tutorial video
25:44