Wiring Schedule of 33 KV FDR Part-2 (For Distribution & Trans.)Under Guidance of Er. G. V. Patel Sir
5:15
troubleshooting of closing control scheme of the circuit breaker
54:21
Wiring Schedule of 33 KV FDR Part-1(For Distribution & Trans.) Under Guidance of Er. GV Patel Sir
53:26
G.V.PATEL (DC earth fault detection and problems related with transformer protection)
19:29
Tripping circuit (1/2) for SIEMENS Reference Breaker 132 KV, TRIP CIRCUIT SUPERVISION
43:22
Lecture 1: Introduction to Power Electronics
14:40
Panel to Breaker Schedule || Part 1 || Control of Breaker || Hindi
20:16
how to make vcb drawing || vcb closing, tripping circuit
17:56