Tim Proyek Lembur || Proses Pembuatan Slope Dipinggir Tebing Curam Di Batu Jomba
1:01:08
Tronton Truck Gets Lost || The Operator Uprights in the Cabin for Finishing the Slope on the Cliff
47:07
Start a New Project! Delete Deep Flooded Pond! Bulldozer D20A & 5Ton Truck Pushing Stone Into Water
54:20
The Mountain Has Been Trimmed, the Jomba Rock Cliffs Are Measured
32:41
Latest Batu Jomba! The rain falls on the vehicle immediately in silding and drifting mode
1:14:29
1Day develop land in city!! Fast action fill land delete field grass by small dozer with dump truck
2:03:10
OMG! Tire Explosion! 24ton Dump Trucks Dumping Gravel & Dozer Push the gravel onto the sand filling
12:16
sloping batu jomba finishing.#batujomba
49:28