Major progress on the solar Power Room. Finishing the Solar Array wiring.

23:40
Installing all in one Solar Inverter with Battery Backup. The EP Cube from Canadian Solar.

18:49
Building our First Solar Array. Easy, Low Cost Solar Ground Mount.

20:10
The Cattle are Causing Trouble. Finishing Up Welding Together the New Feed Trough

7:42
IntegraRack: $545 Ground Mount Solar Array Assembled in Less Than an Hour!

11:02
Henry burns a large brush pile.

19:38
Installing the rest of our solar panels. Finishing up the installation of our solar power system.

21:06
Installing an Off Grid Panel and Transfer Switch. Discovered a problem with our EcoFlow Delta Pros

15:50